Case Study Project ABU HADRIYAH – SAUDI ARABIA

Case Study Project ABU HADRIYAH – SAUDI ARABIA

The Abu Hadriyah Road is an important highway in Saudi Arabia’s Eastern Province. The highway runs from the United Arab Emirates’ Batha’ border crossing to Kuwait’s border, passing near or through the cities of Khobar, Dammam, Qatif, Jubail, and Khafji over a distance of 646 kilometers (401 mi). The King Fahd Causeway, which connects Bahrain and Saudi Arabia, is also accessible via the motorway.This road is the major highway in the eastern province, since it moves goods and services as well as travelers between eastern cities and countries facing the Arab Gulf.

There is a constant maintenance projects this road is getting all over the year, since heavy loads are being driven on it the road goes into rutting and cracking during the year.

Rashid Contracting Establishment (RCE) is one of the main project contractors that are involved in the maintenance project. Their scope of work involves Cold milling up to the subgrade as well as paving new base course and wearing course of 70 Km stretch of road.

  

  • Difficulties on Site

RCE current Bomag pavers came with rotary sensors and during the paving crew were using a steel rod layed on the ground and the Rotary Sensor above it.
Their setup was creating a lot of irregulates specially since the Cold Milling and is not producing accurate level results. The Consultants were not happy with the end results of the paving that is being done and “they were looking for a solution to remove these irregulates and produce a smoother asphalt layer”.

The RCE project manager was approached by Mr. Ali Alrayes from SINTECHS the Local Partner of MOBA and a solution was introduced to solve their issues that is “The Big Sonic Ski”.

• The Big Sonic Ski Solution

During the first stage of introduction to the system the RCE management needed some explanations and proof of concept regarding the result of the system. MOBA Local Partner SINTECHS have answered all the RCE doubts during the open presentation to the management and showed the success stories that has been already established in Saudi Arabia using the Big Sonic Ski.

On August 8th 2021 the Big Ski system have been installed on 2 Bomag Pavers that were on site. The old Rotary system with the steel Rod were discarded and the switch to the Big Ski were almost instant.

• Training on the System

At first, the screed operators were afraid of the new levelling system but MOBA Local Partner SINTECHS have provided the training necessary for the installation and use of the Big Ski system. With small learning curve the screed operators were happy to use the system. 

XSite Pro in Taiwan


XSite Pro in Taiwan

Taiwan is the latest country where MOBA AG has introduced their 3D XSite Excavator control system to support companies working more efficiently and more accurately, – saving money, time, and rework. Xsite allows your team to program every dig in 2D and 3D applications, reducing up to 90 percent of the surveying work on your site. With MOBA you’re equipped with full visibility into depth, height, inclination, and bucket position. Each dig. Every time. For any machine. The Taiwanese company JFCC works on a project in the south of Taichung City to build a new water reservoir with a timeline of over 5-6 years. JFCC works with over 12 excavators and more than 20 trucks to ensure fast and efficient dig out. In total, the project compromises the creation of 3 lakes whereas the bottom must be filled with 3 layers of material. The first layer is sand with a height of approximately 80 cm. The second layer is small rocks with sizes between 3-5 cm with an average height of 60 cm and the third layer of another 60 cm with big rocks sized between 10-15 cm.” 

JFCC put the distribution of material to the test. They used a strip of 400 meters, whereas 200 meters were filled and leveled in a traditional way and 200 meters were being processed using MOBA Xsite Pro on their excavator. Traditionally means that first a surveyor was employed to stake out the needed height for each material (sand, small rock & big rock). Afterward, the operator was using an excavator to follow the stakes of the surveyor to bring the material to grade and level. The second strip of 200 meters needed no surveyor but only MOBA Xsite Pro system installed on an excavator and processing needed tasks by moving independently.

The result of the difference of both strips are significant:

MOBA Xsite Pro performed the task in half the time with more precise finishing, meaning that the operator was able to exploit the height tolerance at a minimum level.

Why is this so important?

Especially in large projects saving (even up to) 1cm of the material makes a huge cost difference. Imaging the distribution of material for a given land size of 100000m². Every additional centimeter would equal the use of 100 tones of additional material and connected costs.
With XSite Pro you can not only work faster yet also more efficiently by cutting operational costs and costs of material.

Thank you very much to Yuan and his team for the feedback and pictures

Succes Story of Zeigner Bohrtechnik in Germany

Succces Story of Zeigner Bohrtechnik in Germany

Bastian Zeigner operates the family business in the second generation. He is one of the few drilling experts in Germany who specialized in Furukawa machines. In his career, he has delivered and set up more than 30 Drilling machines. In addition, Bastian Zeigner is also a pioneer when it comes to selling and supporting MOBA 2D and 3D Drilling systems.

Mister Zeigner, being the face to the customer supported MOBA on developing missing features and thus supported the perfection of our MDS drilling systems.

As well as MOBA, Zeigner Bohrtechnik puts a high value on customer satisfaction and customer support.

The pictures below show a MOBA 2D & 3D extension on a Furukawa type 1800 machine. The pictures are taken in Passau where the machine supports granite mining.

MOBA offers Drilling hang-on systems for every machine type. MOBA offers a broad range of systems from basic leveling and depth to full 3D appliances. Especially MOBA and the OEM Furukawa have a fruitful partnership that allow end-customer to upgrade their existing Furukawa machine with 2D and 3D based on pre-existing MOBA components on most of Furukawa machine types.

With MOBA’s drilling system, your Team can prepare your blast with precisely measured, uniform drill holes and immediately increase your cost efficiency. Save yourself time-consuming manual measurements and drill parallel holes of the same depth and angle in just a few simple steps with the assistance system. The optimum blast will determine the size of the rocks and thus will have a direct impact on productivity. For example, small rocks can be fed directly into the crusher and thus be prepared for selling. Bigger rocks need to be crushed again and slow down the process of productivity while increasing costs of fuel, staff, and wear and tear of machinery.

Comment Basti Zeigner

“I have been working with MOBA for many years and I especially like their fast and effeicient support. MOBA Drilling systems support my customer to incresae their productivity and save money and time on the job.”

MOBA AG is proud to work closely with a drilling expert like Bastian Zeigner. MOBA is looking forward to many years of partnership and projects together with Zeigner Bohrtechnik.

More Infos and contact for Zeiger Bohrtechnik can be found here: ZEIGNER ZHD BOHRTECHNIK – ZEIGNER ZHD BOHRTECHNIK ist Ihr Spezialist für Bohrwagen, Bohrtechnik und Bohrwerkzeuge für Wiesbaden, Limburg, Frankfurt, Taunus und Rhein-Main und ganz Deutschland (zeigner-bohrtechnik.de)

More Infos on MOBA Drilling systems can be found here: Machine Control for Drilling Piling operations better quality and less works in Quarries and Minings (moba-automation.com)

Interested in our 3D: https://novatron.fi/en/systems/surface-drill/xsite-pro-3d-for-surface-drill/

MOBA accurate milling leveling system applied on Carterpillar milling

MOBA accurate milling leveling system applied on Carterpillar milling

On 24th March, MOBA accurate milling leveling system was used on Carterpillar milling, the result was highly appreciated by the customer.

In view of the market need of the accurate milling leveling system, MOBA creatively launched the Big ski to be applied on the milling machine and improved the precision of the milling and flatness of the road surface.

The Choice of Bucket

The Choice of Bucket

Working with an excavator enables the operator to perform a wide-ranging list of tasks depending on the job. Each application demands different skills and corresponding working tools. When operating with XSite Pro, the operator has full flexibility when it comes to the choice of working tool – his or her bucket. XSite Pro supports all common excavator buckets and beyond.
The below video shows the most common buckets used in XSite Pro

In addition, XSite Pro also supports are a wide range of 3rd party Tiltrotors.

Tilt rotators are perfect for grading and leveling work, allowing you to be more efficient when tackling the job and saving you from having to constantly reposition your excavator.

Here is an overview of our most common tilt rotators supported by both our software Xsite App and LNX.

Engcon
Rototilt
Steelwrist
SMP
Kinshofer Nox

The below picture shows the excavator of our customer Juhyun who bundles his own manufactured Tilit rotator with our Xsite Pro system in Korea.

Please see the website of Juhyun for further information: http://en.jhtr.co.kr/sub.php?menu=5

Compaction system in the Test: MCA 500 vs. Conventional Methods

Compaction system in the Test: MCA 500 vs. Conventional Methods

Our team from MOBA INDIA has tested conventional compacting against compacting with MOBA MCA 500 compaction system with their customer L&T RATLAM MPEP PKG 22.
Here is what they found out:

Conventional Compacting would have led to 4-8 passes on average. Based on the system feedback – compaction was already achieved after 3-4 passes.

The report shows an efficiency increase of over 40% – We are very proud of this result.

In addition, the field density test in the laboratory confirmed a desired density at 98,2 % with MCA 500 system.

We deliver better quality in less time by saving a lot of operating costs!

In compaction, increasing the number of passes does not mean increasing the density.

In fact, over compacting can lead to a decrease in density and stiffness.

For asphalt compaction, one also needs to consider the correct temperature to avoid damage to the fresh pavement.

Return on Investment

Unlike in the example above, let us assume a conservative efficiency increase of ONLY 20% and look at the following example of Return on Investment.

We have based our example on the following assumptions:

  • Compaction machine life span: 5 years with 10.000 working hours
  • Machine price: 80.000 USD
  • Interest rate: 5%
  • Efficiency increase 20%
  • The average cost of MCA 500: 5000$
  • Cost of Operator (global average): 8,36 USD

We can show that our Point of Break-even is achieved in less than one year (1000 machine hours) and our ROI may exceed 50000$ over a machine lifetime.

Please contact us if you want to calculate your personal Return on Investment with MOBA MCA 500.